CLIENT
Thistle Communnity Housing
PROJECT TYPE
Rehabilitation
SCOPE
Capital Needs Assessment
Exterior Rehabilitation
Conversion of 3 units to ADA
HVAC Upgrades
COMPLETION
December 2007
PROJECT COST
$1,513,642 Construction Costs
PROJECT DELIVERY METHOD
CM/GC
DESIGN TEAM
VaST architecture
Joseph Vigil, Project Architect
Nicol Associates
PCD Engineering Services
Synertech Systems Corporation
GENERAL CONTRACTOR
SC Holley Construction
(303) 502 6305
|
|
This 72-unit apartment complex consists of four separate buildings. Thistle Community Housing acquired the wood-shingle clad buildings in 2006. VaST prepared a Capital Needs Assessment (CNA) and then later developed a multi-color stucco and metal siding design scheme making a dramatic change and giving each building a separate identity.
VaST also redesigned three of the units to make them handicap accessible, added a rock play area for children and designed the monument sign, building numbers and way finding signage.
Working with Synertech Systems Corporation and PCD Engineering, VaST and the Owner were able to determine what energy upgrades would be most cost effective.
|