CLIENT
Compleat Development
PROJECT TYPE
Remodel and addition
SCOPE
794 Addition
1,420 Remodel
2,214 Total
COMPLETION
August 2009 -- November 2009 Under Construction
PROJECT COST
$190,000 Construction Budget
COST / S.F.
Approximately $86/SF
DESIGN TEAM
VaST architecture
Joseph Vigil, Project Architect
Jacob Lovoi, Intern Architect
Brandy LeMae, Kitchen and Bath Design
LT Engineering
Leslie Tyson, Structural Engineer
Populous Sustainable Design Consulting
David Neiger
GENERAL CONTRACTOR
Jeff Davis
(303) 827-1773
|
|
5333 Euclid is a "pop-top" project commissioned by Compleat Development. The property was originally a single story and had been a rental for the past few years. Working closely with Compleat Development, VaST is helping to transform it into a contemporary, energy-efficient, two-story, single family home. The second level contains a full master-suite with killer views of Boulder's Flatiorns. Downstairs are two bedrooms, a dream laundry room, a dining room that opens onto the deck and a brand new IKEA kitchen.
Sustainable Features:
Recycled Existing Residence
Tankless Hot Water Heater
Fiberglass Windows
Increased Insulation
Dual-Flush Toilets and Low-Flow Shower Heads
Low-VOC Paint
Wool-Blend Carpet
This project is expected to receive a HERS rating of 63 (37% better than code).
This property is currently listed for sale
$759,000 (MLS #607045)